NOTICE OF BUILDING WORK AND SCHOOL REDEVELOPMENT 2023-2024
NOTICE OF BUILDING WORK AND SCHOOL REDEVELOPMENT
Building works (Phase 2) are scheduled for completion in autumn 2024-25. Phase 3 will follow.
During the refurbishment, please adhere to the following safety guidelines:
ALL VISITORS: Report to Reception, wear identification issued by the School Office at all times.
ALL CONTRACTORS: Sign in at the Site Office, be known to the Site Manager, and wear relevant identification at all times.
PARENTS & CARERS: Supervise children at all times to ensure they stay within sight.
Thank you for helping us ensure everyone’s safety.
02.11.17 Lower 7 and Lower 8
Date: 2nd Nov 2017 @ 11:48am
Today we have created oil pastel drawings of our chosen animals. We really enjoyed this and worked very hard!
Later, we designed our own PE games, wrote instructions for them and then tried them out! We had great fun!
NOTICE OF BUILDING WORK AND SCHOOL REDEVELOPMENT 2023-2024
NOTICE OF BUILDING WORK AND SCHOOL REDEVELOPMENT
Building works (Phase 2) are scheduled for completion in autumn 2024-25. Phase 3 will follow.
During the refurbishment, please adhere to the following safety guidelines:
ALL VISITORS: Report to Reception, wear identification issued by the School Office at all times.
ALL CONTRACTORS: Sign in at the Site Office, be known to the Site Manager, and wear relevant identification at all times.
PARENTS & CARERS: Supervise children at all times to ensure they stay within sight.
Thank you for helping us ensure everyone’s safety.